Skip to content
Beautifying everything under the sun
Open 24/7 Boca Raton and all of South Florida (954) 807-3019
Free Estimate

Planning

What HOA colour approval actually involves

Across Boca Raton, Coral Springs, Wellington and most of Palm Beach County, the colour is not yours to pick alone. Knowing the process before you fall in love with a shade saves a month.

If your property sits inside a homeowners association, the governing documents almost certainly reserve the right to approve exterior changes, and repainting counts. The body that does it is usually called an architectural review board or architectural control committee, and it exists to keep the community visually consistent. Whether you agree with that is beside the point: painting without approval is the one version of this that reliably costs money, because the remedy is repainting.

Find out what regime you are actually under

Communities fall roughly into three groups, and the difference changes everything about how you plan.

  • A fixed palette. The association names a specific set of approved schemes, often tied to a manufacturer and a code. Your choice is which of those, not whether. This is common in larger planned communities.
  • An approval process with open colours. You may propose anything, and the board judges it against general standards and what neighbouring properties look like. More freedom, more uncertainty.
  • A body and trim rule. Body colours come from a list, but trim, doors and accents are looser. Very common, and the detail that most people miss until they submit.

The documents that tell you which are the declaration of covenants and any architectural guidelines published alongside it. The management company will send them, and it is worth asking specifically for the current approved palette rather than the guidelines alone, because palettes get revised more often than covenants do.

What a submittal usually has to contain

Requirements differ by community, but the recurring list is short and most rejections are for omissions rather than for taste.

  • A completed application form, from the management company or the association portal.
  • The specific colour for every surface, named by manufacturer and code rather than described. "Warm beige" is not a submission. A manufacturer name with its code is.
  • Which surface each colour goes on: body, trim, fascia, garage door, front door, shutters, any accent.
  • Physical samples or printed chips, often required rather than optional, and sometimes required in duplicate.
  • Photographs of the property as it currently stands, occasionally including the neighbouring houses on both sides.
  • Contractor details, and in some communities proof of insurance held by whoever is doing the work.

Timelines, and why they matter more than they should

Many associations have a stated review period, often thirty days, and many boards meet monthly. Those two facts together mean a submission that misses a meeting by a week can sit for the better part of two months before anyone looks at it. If the application then comes back with a query, the clock frequently restarts.

The practical consequence is that colour approval, not crew availability, is usually the long pole in an exterior repaint here. If you want the house painted in the dry season, the submittal wants to be in well before the dry season starts. Our note on when to paint an exterior in South Florida covers why that window is contested to begin with.

Why applications get rejected

Boards vary, but the reasons repeat:

ReasonWhat it looks likeHow to avoid it
Incomplete submittalNo samples, or a surface left unspecifiedWork through the checklist and specify every surface, including the garage door.
Colour not on the paletteA close match proposed instead of a listed codeSubmit the listed code. A near match is still a different colour to a reviewer holding the chip.
Too similar to a neighbourSame scheme as an adjacent propertySome communities enforce separation. Check before choosing.
Trim treated as bodyA body colour proposed for fascia or shuttersRead the body and trim rule carefully. It is the most commonly missed clause.
Sheen not statedColour given, finish notState the sheen for each surface. Some palettes specify it.

If the answer is no

A rejection is usually a revision rather than a refusal, and most boards will say what would be acceptable if asked directly. The useful move is to ask what specifically failed, rather than resubmitting a different guess. If the objection is to a single element, changing that element is far quicker than starting the scheme again.

Where a community has a fixed palette and none of it appeals, the room to move is usually in trim, front door and shutters rather than in the body. A restrained body colour with a considered door often reads far better than a bolder body would have anyway.

How we handle it

We pull your community list before we talk about colour, so the shortlist you choose from is one that can be approved. If a submittal is rejected we redo it at no charge. The colour consultation comes free with your project and includes the approved palette check, and the final scheme, with product names and codes for every surface, appears on your written estimate before anything is opened.

If you want to narrow a shortlist before that conversation, photograph the elevation in morning light and again in late afternoon and look at the two together. Florida light moves a colour further than most people expect, and a scheme chosen under one of those is often a surprise under the other.

Common questions

Do I need HOA approval to repaint my house in Boca Raton?
If the property is inside an association, almost certainly yes. Most declarations reserve approval of exterior changes to an architectural review board, and repainting counts. Painting without approval risks being required to repaint.
How long does HOA colour approval take?
Many associations state a review period of around thirty days and many boards meet monthly, so a submission that misses a meeting can wait considerably longer. A query that comes back often restarts the clock, which is why approval rather than scheduling is usually the longest step.
What do I need to submit for architectural review?
Typically the application form, every colour named by manufacturer and code, which surface each goes on, physical samples or chips, photographs of the property, and contractor details. Most rejections are for omissions rather than taste.
Can I choose any colour if my community has a palette?
Usually not for the body. Where a fixed palette applies, the room to move is generally in trim, front door and shutters. Submitting a near match to a listed colour rather than the listed code is a common reason for rejection.

Get the real number

Send the details and we will come measure, talk through the finish and put a written number in front of you before anything begins.

Illustrative photography. Our own job photographs are in the gallery.